STAFFIN SLIPWAY IMPROVEMENTS
PROJECT DESCRIPTION
Improvements to jetty including lengthening, heightening, low level landing stage, and all tide berth. Protective rubble mound breakwater providing shelter to Slipway. Walkway on breakwater crest, protected by armour stone wave wall.
Client - The Highland Council - Completion - 2000 - Value £0.3m
AREAS OF RESPONSIBILITY
Feasibility study, conceptual design, detailed design, project management, full-time supervision of all site work, including underwater inspection of concrete and breakwater armour.
PRINCIPAL ELEMENTS
- Breakwater Rock Armour - 10000m³ Slipway Reinforced Concrete - 150m³
- Breakwater Rock Core - 4000m³
- Slipway Rockfill - 200m³ Low Water Berth and walkway Concrete - 100m³
KEY FEATURES
Breakwater constructed with materials from foreshore. Improvements in accessibility, flexibility and protection of existing slipway
CONTRACTORS
Black Isle Civil Engineering